Our Project – Week 8
Sep 17th
The concrete is laid for the first floor. The wooden casing for the stairway upstairs is built and all the remaining RSJs are welded into place. We can really get a good feel of the aspect of the house now that we have a good idea where the roof will be!
[...]
Our Project – Week 7
Sep 12th
The remaining RSJs are welded into place, and the first floor is started. The same process is followed; a wooden shell is built to support the main concrete beams, the concrete blocks are laid along with the iron mesh reinforcing, and the base-plates for the RSJs put into place. The stairs between the garage and [...]
Our Project – Week 6
Sep 3rd
Another busy week! The whole of the ground floor was laid. This consisted of basically propping up a floor of special concrete blocks, and then filling it with concrete. As you can see, the first RSJs forming the main structure of the house were welded onto their base-plates.