Our Project – Week 7
The remaining RSJs are welded into place, and the first floor is started. The same process is followed; a wooden shell is built to support the main concrete beams, the concrete blocks are laid along with the iron mesh reinforcing, and the base-plates for the RSJs put into place. The stairs between the garage and ground floor are prepared.