The last fornight has seen a lot of smaller details going on before the plastering work began towards the end of the week. The ‘pre-frames’ for the windows have been fitted, along with the finishing up of most of the plumbing. The outstanding bits and pieces of brickwork have been tidied up, such as the [...]