Our Project – Weeks 4 & 5

A lot happened during these two weeks, while we were in the south of Spain on holiday. The carcass to contain the concrete was finished, with the iron reinforcing located inside. It was then filled with concrete. A day or two later the wooden casing was removed and the RSJs located. The second set of footings at a higher level for the back of the house were then prepared and laid.
Week 5
Week 5
Week 5